Skip to content
Black and white photo of a technician in a cap walking toward the rear of a light-coloured Lamborghini with its doors open, inside a bay at Brookswood Tint in Langley

Serving Mission

Window Tint & PPF for Mission Drivers

At a glance

Brookswood Tint is about 27.4 km west of Mission City Hall in a straight line, at Unit 312, 20560 Langley Bypass, reached either over the Mission Bridge and Highway 1 or along Lougheed Highway and across the Golden Ears Bridge. LLumar window tint starts at $240, LLumar Platinum PPF at $850, and the Track Package for Mission Raceway days at $1,900. The shop serves Mission drivers who make the trip.

From Mission City Hall
About 27.4 km, straight line
River crossings
Mission Bridge (Highway 11) or Golden Ears Bridge
Snowfall, Mission West Abbey
About 75 cm a year (1981–2010)
Track Package PPF
From $1,900, LLumar Platinum
Window tint
From $240, LLumar ATC

Mission Bridge or Golden Ears Bridge: which way to Langley?

Both work, and the choice comes down to construction and where in Mission you start. Mission City Hall, at 8645 Stave Lake Street, is about 27.4 km east of Unit 312, 20560 Langley Bypass in a straight line between map coordinates.

South over the Mission Bridge

From City Hall, take Stave Lake Street down to Lougheed Highway (1st Avenue), then Highway 11 south across the Mission Bridge into Abbotsford. Carry on to Highway 1 westbound, leave at the 232 Street exit, and follow Highway 10 (232 Street, then Glover Road) into Langley City and onto the Langley Bypass.

West along Lougheed Highway

Stay north of the river on Lougheed Highway (Highway 7) through Maple Ridge, using the Haney Bypass, then Dewdney Trunk Road and 203 Street to the Golden Ears Bridge. South of the bridge, 200 Street runs straight down to the Bypass. The Maple Ridge page describes that last part in more detail.

What is the Highway 11 interchange work doing to the trip?

It puts a construction zone on the Mission Bridge route at the Abbotsford end, with completion expected in 2031. Major construction on the Highway 11 Interchange Project started in spring 2026, replacing the interchange with Highway 1 and widening 2.1 km of Highway 1 from McKenzie Road to just east of it.

The province tells drivers to expect construction speed zones, lane shifts and overnight closures, with a reduced 50 km/h limit on Highway 11 itself. Intersections at Highway 11 with Marshall Road and Delair Road are part of the work too. Check DriveBC before you leave and, if the interchange is backed up, the Lougheed Highway route is the alternative.

The bridge itself isn’t the City’s to maintain. Mission’s road maintenance page says the Mission Bridge and its on- and off-ramps are managed by the provincial Ministry of Transportation and Transit and maintained under contract by Emil Anderson Maintenance Co. Ltd.

How does Mission keep its hills drivable in winter?

By treating early and giving the main hills extra priority. Mission’s snow and ice control page divides the city into 11 snow route areas, each with Priority 1 roads (emergency accesses, arterials, collectors, transit and school bus routes, and the business district) and Priority 2 roads.

Much of Mission’s winter work happens overnight and in-house:

  • Ice patrols: from November through February, night crews go out whenever the temperature at the Public Works Complex is 2 °C or lower at the start of their shift.
  • Brine made on site: Public Works makes its own brine and stores around 53,000 L of it.
  • Pre-treatment: Priority 1 and transit routes are brined about four hours before an expected storm, and crews also brine when patrols find ice, when 25 mm or more of snow has built up, or when freezing rain is forecast.
  • Sand-salt mix: spread on hills, at the approaches to intersections and in known icy spots.

One more local detail matters for paint: the City’s road maintenance page says normal street sweeping is curtailed from December to March. Sand spread in winter isn’t swept up on the usual schedule, so cars keep driving through what’s left of it.

Does Mission’s hillside weather station see more snow?

Yes. The closest station with 1981–2010 normals, Mission West Abbey, sits about 1.2 km from City Hall at 197 m elevation, and its record differs from Abbotsford Airport’s in both directions:

1981–2010 normal Mission West Abbey Abbotsford A
Snowfall, year 75 cm 55 cm
Days with 5 cm of snow or more 5.2 3.4
Nights at or below 0 °C 40 53
Average daily high, July 22.4 °C 24.0 °C
Days above 30 °C 3.5 8.7
Precipitation, year 1,883 mm 1,538 mm

More snow, fewer frosty nights and a milder summer: that mix points a Mission driver toward protecting the paint first. ATC on the rear windows does the basic job, and IRX is there if the car sits in summer sun.

What protection suits a car that goes to Mission Raceway?

The Track Package, which is the shop’s package built for that use. Mission Raceway Park, in Mission, runs road course, drag, drift and autocross events, so the track is close to home for Mission drivers.

The Track Package in LLumar Platinum adds partial roof, A-pillars and rocker panels to a Full Front’s hood, fenders, bumper, headlights and mirrors, from $1,900, usually in 1–2 days. Film comes with LLumar’s 10-year manufacturer’s limited warranty, which the shop’s terms say covers yellowing, cracking, bubbling and peeling. The Track Package page shows the panel list, and the track-day protection guide covers preparing a street car for its first event.

How do you make the trip from Mission worth it?

Bring the car once for everything. The shop serves Mission drivers who make the trip, and the published starting prices are the same:

Job From Usual time
Tint, five rear windows of a sedan or pickup $240 Ready the same day in most cases
Partial Front $850 Generally one day
Full Front $1,550 One to two days
Track Package $1,900 One to two days, same as Full Front

Before any film is laid, the paint gets decontaminated, and corrected where it needs it; bigger vehicles can cost more. One rule doesn’t bend for the distance: under MVAR s. 7.05(8), front side windows stay bare and the windshield may carry film only in its top 75 mm. Front-door film is available on request, with a plain warning first that the car won’t be road-legal and could be ticketed $109 or put under a Notice & Order. List what you’d like on the quote form and the shop will reply with dates.

Diagram of a white Porsche 911 with the front end, mirrors, A-pillars, the leading edge of the roof and the rocker panel below the doors shaded green
Track Package PPF, from $1,900: Full Front plus A-pillars, part of the roof and the rockers

Asked at the counter

Questions about mission

01Which bridge should I use to get from Mission to the Langley Bypass?

Either works. The Mission Bridge takes you south to Highway 1 west and into Langley on Highway 10, while Lougheed Highway west leads to the Golden Ears Bridge and down 200 Street. Check DriveBC for the Highway 11 construction before choosing.

02Do I need full-body PPF for lapping days at Mission Raceway?

The shop's Track Package is the one built for track use: the full front plus A-pillars, part of the roof and the rocker panels, from $1,900. Full Vehicle film, from $4,000, covers every painted panel if you want the rest protected too.

03Can I combine tint and PPF to save a second drive from Mission?

Yes. Put both on one quote and the shop will give you a single drop-off and pick-up plan; tint is usually same day, and a Track Package takes one to two days.

04Is front window tint legal for a car registered in Mission?

No. The same provincial rule covers Mission as everywhere else in BC: bare front side windows, and film on the windshield only within its top 75 mm. The shop can install it on request, after explaining the $109 ticket and Notice & Order risk.

Get a quote today.

Call or text 604.534.6433, email us, or send the form and we'll come back with a price and a date.